Combi-High-Temperature Furnaces for Debinding and Sintering in One Process

The smaller furnace models can be equipped with the DB50 laboratory debinding package, which is designed for small binder amounts and low vaporization rates. In the basic design, the DB100 debinding package is available for larger furnaces. 

プロセス制御
HT160_18DB200-3

機能と設備

HT160_18DB200-3.png
HT276_18DB200-3.png
HT450_17DB200-3_KNV.png
HT_TNV_KNV.png
HT_Einblasung.png
Zweituerausfuehrung.jpg

For combined debinding and sintering processes with sintering temperatures up to 1750 °C, the high-temperature furnaces will be equipped with a passive safety system which ensures a safe operation by monitoring all functions relevant during debinding . In addition, fresh air is supplied to the furnace chamber in a controlled way to reliably prevent a combustible atmosphere forming inside the furnace by diluting the binder gases.

The smaller furnace models can be equipped with the DB50 laboratory debinding package, which is designed for small binder amounts and low vaporization rates. In the basic design, the DB100 debinding package is available for larger furnaces. With this debinding package, preheated fresh air is introduced so that the furnace is operated with overpressure during the debinding phase.

The DB200 debinding package is the ideal solution for high-temperature furnaces used in production processes. With this safety system, the furnace has a fresh air preheater and the preheated air is blown into the furnace horizontally through perforated air inlet tubes. During debinding, the exhaust gases are discharged from the furnace via a separate outlet with exhaust gas fan. The volume flows of fresh air and exhaust gas are controlled so that a slight negative pressure is always maintained in the furnace chamber during debinding.

  • Like high-temperature furnaces HT, however:
  • Stainless steel exhaust hood as interface to the customer's extraction system (DB200 option: separate removal of exhaust gases during debinding)
  • Controller with touch operation P570 (50 programs each with 40 segments) for models HT 16.. - HT 40..
  • From model HT 64..: HiProSystems H1700, including Siemens PLC control system and 7" touchpanel as operating interface 

Debinding Package DB50

  • Laboratory option for applications with low evaporation rates for high-temperature furnaces HT 16.. - HT 40..
  • Fresh air fan to introduce a defined volume of fresh air
  • Exhaust gas and exhaust air discharged via one outlet with a motor-driven flap in an exhaust hood

Debinding Package DB100

  • Basic design for safe debinding with small amounts of binder for high-temperature furnaces from model HT 64..
  • Fresh air fan and fresh air preheater
  • Exhaust gas and exhaust air discharged via one outlet with a motor-driven flap in an exhaust hood
  • Performance of the debinding package customized to the process requirements

Debinding Package DB200

  • Professional solution for large amounts of binder and changing debinding processes
  • Fresh air fan, fresh air preheater and monitoring of fresh air and exhaust gas flow rates
  • Separate discharge of exhaust gases during debinding and exhaust air during cooling via separate outlets with motor-driven flaps
  • Extendable with catalytic or thermal post combustion for a single furnace or alternating operation with two furnaces
  • Performance of the debinding package customized to the process requirements

付加装置

  • With debinding package DB200: Thermal and catalytic exhaust air treatment
  • Redundant thermocouples to increase process reliability
  • Thermocouple to control the heating with calibration certificate
  • Calibration interfaces for the measuring section
  • Thermocouple exchange system for temperature measurement via thermocouple types B and S with automatic removal device for more exact control during debinding (for models from HT 160/..)
  • Special heating elements e.g. for zirconia applications

技術仕様

Model

Tmax

Inner dimensions in mm

Volume

Outer dimensions1 in mm

Heating power

Electrical

Weight

 

°C

w

d

h

in l

W

D

H

in kW3

connection

in kg

HT 16/.. DB50

 

200

300

260

16

810

645

1780

12.0

3-phase2

280

HT 29/.. DB50

 

275

300

300

29

975

690

1910

9.3

3-phase2

390

HT 40/.. DB50

1600

300

350

350

40

1000

750

1910

12.0

3-phase

430

HT 64/.. DB100-1

or

400

400

400

64

1190

870

1960

18.0

3-phase

660

HT 64/.. DB200-..

1750

400

400

400

64

1190

870

1960

18.0

3-phase

820

HT 160/.. DB100-..

or

500

550

550

160

1240

995

2230

21.0

3-phase

815

HT 160/.. DB200-..

1800

500

550

550

160

1240

995

2230

21.0

3-phase

880

HT 276/.. DB200-..

 

500

1000

550

276

1300

1500

2230

36.0

3-phase

1300

HT 450/.. DB200-..

 

500

1150

780

450

1350

1690

2500

64.0

3-phase

1450

1Outer dimensions vary depending on the scope of supply. Dimensions on request.
2Heating only between two phases
3Depending on furnace design connected load might be higher


 

見積依頼

見積依頼

CAPTCHA
この質問はあなたが人間の訪問者であるかどうかをテストし、自動化されたスパム送信を防ぐためのものです。